Stade de France Stadium: Overlap Technique
Sefi-Intrafor’s teams have been hard at work since the month of July to build the diaphragm wall foundations of the future Stade de France station (line 15 east). Panels of two thicknesses were used, 1,200mm and 1,500mm, at a depth locally exceeding 60m to ensure 3m anchoring in the coarse limestone. Grouting works were carried out beforehand to prevent any risks of leakage of mud and landslides during the setup of the diaphragm walls.
Discover